march 6 07 layout room 

I've made a bit of progess and acquired some new equiment.

Lighting is horrible and this makes for horrible pics.

After finishing ground cover for the hill/mountain. I decided that it'd be nice to see one small corner of the layout look somewhat finished to break up the pink prairie. I still need to go and clean up excess ballast from the top of the ties and such.

New equipment. I picked up this DCC ready goat from Model power. Runs really well at a small speed. These pics show one of the few times this little guy will ever be out on the mainline. His home will be servicing local industry in my as yet unamed town.

I've discovered that I need to really rethink the lighting. I'll pick up a few more 4' fixtures and see if that helps. I'll get something better before the next photo shoot.

ballasted track
ballasted track
Viewed: 161 times.

ballasted track1
ballasted track1
Viewed: 131 times.

ballasted track2
ballasted track2
Viewed: 125 times.

new goat
new goat
Viewed: 141 times.

overhead goat
overhead goat
Viewed: 154 times.

layout
layout
Viewed: 131 times.

looking down the main
looking down the main
Viewed: 150 times.

future track homes
future track homes
Viewed: 141 times.

I've got all this trackage for the industry siding pinned down. Still not too happy about my elevation changes coming off the branch line.
I've got all this trackage for the industry siding pinned down. Still not too happy about my elevation changes coming off the branch line.
Viewed: 143 times.

spur tracks other side
spur tracks other side
Viewed: 134 times.

spur tracks1
spur tracks1
Viewed: 137 times.

pink hill under construction
pink hill under construction
Viewed: 123 times.

messy plastering table
messy plastering table
Viewed: 141 times.

Powered by Gallery v1 RSS